I use the following products and process to achieve excellent moisture resistance along w/ a very low sheen finish. The stock actually looks like there isn't any finish on it.
After the stain is dry, the stock is rubbed hard w/ 0000 steel wool to remove any unabsorbed stain and also to lighten the high wear areas. The stock is then very smooth.
2 generous wipe on/wipe off coats of LMF sealer are applied and the soak in time is approx. 10 mins. w/ a complete dry between coats. When the last coat is dry, a hard rub w/ 0000 steel wool removes any surface sealer. The stock is vacuumed and 2 sparse coats of Wahkon Bay Trucoat are applied w/ the fingers w/ a complete dry between coats. The staining and applying the finish take 36 hrs. The final finish is a little shiny after the last coat dries but then turns dull and requires a few mins of rubbing w/ a fluffy towel to achieve some sheen.
The LRs shown below were finished as described above......Fred
View attachment 4787 View attachment 4788 View attachment 4789